Homestead Structures would be happy to help you plan and build your new outdoor bar shed. Whether you’re looking for someone to complete the structure start to finish, or you just want a bar shed kit to build yourself, our product specialists would love to help you out! Call us at 877-272-7252 or fill out the form here to discuss your backyard project.
I really like the 16 x 16 Aspen and I’m currently installing my foundation and slab with a tentative purchase intent with your company. Our code here is, maximum of 256 sq. ft. shed without a permit. I’ve excavated -2′ around the perimeter and – 6″ for the pad. Right now I’m at that point of decision of concrete footer or not. I can fill my footer area with compacted 30D stone, then level the pad to grade or I could form and pour these footers which will cost a lot more bennies. I plan to frame the 16 x 16 pad for 6″ of concrete and call it a day. A few questions please; Will compacted stone under a concrete pad be sufficient for your shed? Can the shed be built without the floor in the quote if I have the concrete pad? What exact dims should that concrete pad be for your 16×16 Aspen? Thanks for your help, now back to work!

Very Happy the description says what's included and everything is great. There are 24 of 1 bracket type and 12 of the other. And for the cost you cant do much better. I agree with other review the instructions could be better. That being said I'm using mine a bit differently so the instructions are pointless for my case i had to make my own plans and materials list. I am using the 24 brackets for my top roofline (12 ridge beam Conectors) and purchasing other brackets from my local home improvement store to fasten my roof trusses to my own bottom framing that the 12 other connectors in the kit will be used in addition to several others being I am making a signifcantly bigger out building out of it for my car to be parked inside of. So far so good on that project and the ... full review
Dig trenches about 12 in. wide and about 10 in. below where you want the bottom edge of the joists to end up. Pour 4 in. of gravel into the trenches and level it off. Make sure the gravel in all three trenches is at the same height. Then cut the 6x6s to 12 ft. long and set them in the trenches. Measure to make sure  the 6x6s are parallel. Then measure diagonally from the ends of the outside 6x6s to make certain they’re square. The diagonal measurements should be equal. Finally, level the 6x6s (Photo above and Figure B in project pdfs).

These sheds are perfect for small yards where space is scarce. If you plan on storing large items inside, make sure to install double doors. On the other hand, if you want to design it like a very small office, one door is enough. Lean-to sheds are generally used for storing tools like nails, screws, electric drills, gardening equipment etc., basically anything that fits. Lean-to sheds can be placed in close proximity to your house or other existing structure.


Disclaimer: Please note that this guide is intended to present general information regarding the subject. All information indicated are representative and not exhaustive, which means that the results may vary depending on your item, its size, complexity and other circumstances. This is only advice and we do not accept responsibility for any problems you may have whilst following this guide, it is only a representation and not a definitive guide. When in doubt, please ask your manufacturer before proceeding.
Before you cover the joists with the 4 x 8-ft. sheets of flooring, plumb and brace the 4×4 posts with diagonal 2x4s. Also stretch a string or mason’s line from front to back along the top edge of the outside joist to make sure the walls and joists  are straight. The attic floor needs to be square and have straight sides. If not, the rafters won’t fit correctly.
Thank you for visiting our blog. Are you using pavers as blocking or doing a large area with pavers to put your shed on? Either way, we recommend using pea gravel under pavers or blocks for drainage, then leveling by adding more blocks or pavers and avoid building leveling materials going higher than 16”. Can you describe how you are using the pavers under the shed treated floor frame?
Door placement is also important. You often see doors placed on the gable end of the building, which looks nice, but makes it virtually impossible to reach items stored at the rear of the shed. A better alternative is to put the door on the long side wall, so that you'll be able to access items to the right, left and back. Another option is to install doors on both gable-end walls, so that you'll be able to easily reach items from either end of the shed.
Sheds have become multipurpose, must-have buildings that are competing with pergolas and gazebos as your next backyard project. Pictures on social media only grab people's desires more. Before going any further, do your research. Figure out what you need it for and why, and whether you will built the shed yourself, or hire a pro. Check with your local planning department to comply with codes and guidelines. Determine if the shed will mirror the architectural features of your home--always a good idea. Assess your budget, materials needed, and the time it will take to complete the project.
The idea for this has been in my head for a while (and on a paper for a shorter while), but let’s face it: I need more DIY space — especially for tools and garden storage. The one-car garage I have is packed full all the time with the mower, gardening materials, woodworking tools, paint, and more. Even though I try as best I can to keep it organized(ish… meh) by cleaning it out once a year, that still means I spend a lot of time looking for the things I need in a very tight space (you would think losing things in a smaller space would be less frequent, but… nope).
Constructing a get rid of may well seem to be an overwhelming occupation to some do-it-yourself newcomers. But produce a stage, excellent, difficult base and the rest actually must be straightforward. Creating the basis for any backyard garden building is easy for an person to accomplish. However we suggest an further man or girl is on-site through the creating of your get rid of to assist with lifting and placing roofing and wall construction sections. Preparing authorization is typically not essential for any mass made backyard garden developing getting said that, if you reside inside of preservation area or even the creating could intrude on the neighbour's back garden, you may wish to look for advice from next door neighbours or local authority or council in advance of building. Preparing: Feel about the best possible site for the garden building with regards to: Entry sides of your developing for lengthy term preservation and putting on timber treatments. Surrounding Backyard issues, like vegetation small trees and shrubs etc. Day light (a clear brilliant area is most effective if the developing will be used like a work store for instance) Search at the planned place (for summer houses for example.) Do you require to operate a power source in the direction of the building and will it give any advantages? Strategies: It is vital to produce a degree and dried out foundation. It's unfeasible to put with each other a get rid of whilst on an unsound basis, or else bolt holes attaching the wall structure sections won't slide into line. For much more substantial structures especially in which the drop will be employed like a functioning region the full concrete floor base is most successful. Possessing mentioned that, typically there are two sorts of foundation ideal for an outside creating, take into account the two: Concrete Flooring Basis, or Paving Slab Foundation: Whatever technique is more fascinating, it is recommended that you've got received a two-inch (5 centimetres) leading all-about the bottom of your garden building. To determine the dimensions of foundation essential for the real creating you intend to construct, incorporate four inches to the whole foundation measurements to make sure an ample basis measurement. Step # one: Decide exactly where you can placement your garden get rid of in the the best possible location, allow adequate length from shrubs or fencing for convenient accessibility to every facet. Use pegs and wire to attract out your basis, ensuring it is its 2 inches (five centimetres) greater than your garden drop. Lastly, determine diagonals to guarantee the region is square. Phase # two: A concrete floor foundation calls for 3 inches (7.five centimetres) of compressed hard main beneath the three inches (7.5 centimetres) cement layer. The foundation could be degree utilizing the soil or rose over it. If it's to become degree dig deep into the leading component soil to six inch (15 centimetres) permitting for your tough core coating and 3 inches (7.5 centimetres) depth of concrete. Level the area making use of a rake and spade, and consider absent the pegs. Phase # 3: Construct levelled type function. This needs calculating, cutting and putting in sound timber, for the kind of the basis to be in a position to retain the cement. Examine out diagonals to be positive the framework is sq.. And in addition make sure the formwork is stage, because this will detect whether your system is a hundred% stage. Up coming, distribute a covering of perfectly compressed hard main and go over utilizing a generous quantity of good sand. Stage # 4: Up coming, blend together concrete making use of 1 element cement to five parts ballast or use luggage of dry-mixed concrete that you merely include drinking water. Little portions of drinking water ought to be added during a period and blended to the concrete blend to make certain abnormal quantities are not added in creating the concrete sloppy, because the concrete should to be preserved on the dry aspect. Distribute the concrete equally and relatively very pleased of the formwork. This is usually then levelled down with an extended straight edge of solid timber sitting down on the formwork employing a cutting action gradually throughout the whole top of the newly laid concrete. If damp conditions are forecast, cover the cement with polythene for 24-hours. In the sunshine protect the foundation with moist bags and sprinkle all of them with drinking water within the 24-hour time time period, it will make positive the drying out concrete will not likely shrink and fracture. The final result is an even, great, stage basis, an perfect base for the creating of a backyard garden building. Slab Foundation Method: Phase # one: Talked about previously mentioned earlier determine where you can spot your get rid of inside an optimum area, allow enough distance from hedges or partitions for straightforward access to the sides. Use pegs and twine to attract out your foundation 2 inches (5 centimetres) larger than the location from the developing on either side. Finally, a figure out angled to guarantee the spot is square. Stage # 2: Eliminate the top soil and burrow out to the depth of around two.five inches (seven centimetres) to assistance the base. Degree locations and take away the pegs. Stage # three: Mix with each other a single element bare cement to 8 elements developing sand to get a dried sand and bare cement combination. Distribute this similarly making certain this mixture is positioned roughly four centimetres in depth. Now, "rake "this to some level. Step # 4: Starting with the corner and running to the outdoors, spot the slabs by touching upon the middle of every and each slab utilizing a rubberized mallet. By making use of a spirit stage, make particular all of the foundations are sq., level and totally butted together with a single yet another to get a powerful base. Step # 5: The concluded foundation should to certainly be stage and sq.. Do just 1 last test with an extended straight edge to see if the base is stage from just about each and every spot, as effectively as look at the diagonals to in the end verify the foundation is square. Bear in mind to brush absent any abnormal dried out sand/cement mixture that could impede the levelling of your drop. The outcome is an even, sound, stage foundation. The most perfect foundation for the producing of a backyard drop.
This step is easier with two people. Start by measuring the length of the ceiling then cut the amount of straw cladding you need – allow a 5cm surplus.  You will need two lengths.  While one person holds the straw cladding in place the other can nail it in place. Hit the nail in until secure then hammer it at a 90-degree angle so it holds the straw cladding in place.  Put nails in every 15-20 cm to secure.

ClickBank is the retailer of products on this site. CLICKBANK® is a registered trademark of Click Sales, Inc., a Delaware corporation located at 917 S. Lusk Street, Suite 200, Boise Idaho, 83706, USA and used by permission. ClickBank's role as retailer does not constitute an endorsement, approval or review of these products or any claim, statement or opinion used in promotion of these products.
How about scouring the river for a few days to gather wood for a shed? That may sound like a ridiculous and like one of those cool shed ideas. However, it is cheap, out-of-the-box, and likely a possibility for a unique and very rustic garden centerpiece. It may not be classy but why does it need to be. It is definitely an idea with potential for a different kind of beauty. IDEA: Gather some driftwood and turn it into a rustically beautiful garden shed

*Please note the content in this blog post is intended only to provide a summary and general overview on building a pallet bar. It is not intended to be comprehensive. You should refer to the instruction and safety manual of tools and paints you use and seek professional advice if unsure of how to execute the tasks before acting or relying on any of the instructions.
Many sheds come with floor bearers already fixed to the underside. These are smaller timber bearers - usually 3 x 2 inches - that run perpendicular to the timbers of your wooden frame. If yours doesn’t, it’s worth adding some (at intervals of 16 to 24 inches) to allow air to circulate and prevent damp. Just fix them to the base before you start building your shed.
a. Begin by pounding in the first corner stake. Tie a string to the stake and stretch it out to the other corner. Mark the string at 4’ from the stake. Tie another string to the stake and stretch it to the other corner. Mark that string at 3’ from the stake. If the measurement from one mark on the string to the other is 5’ then your corner is square. You’re now ready to install the remaining three stakes. Here is an illustration to show how the 3/4/5 method works.
Chances are if you have applied for a permit you'll know the answer to this question already. Usually, there are two types of anchoring if you are not building on top of a concrete slab. One way is to anchor your shed to the ground using cable tie-downs, or anchoring it with your floor being fastened securely to posts which are sunk into the ground at a pre-determined depth in concrete.
You can build the walls on any flat surface, but the shed platform is ideal. Snap chalk lines on the plywood deck, 3-1/2 in. from the edges of the platform, to indicate the inside edge of the walls. Measure to make sure the lines are parallel and 89 in. apart. Then chalk a line down the center (Photo 1). You’ll use this line to make sure the angled top plates meet in the center.
×